Docket 2008-196-E
Opened On Friday, May 30, 2008
Status Open
Industry Electric
Summary Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina
Applicants (expand)
Total: 1
Representatives (expand)
Total: 18
Intervenors (expand)
Total: 13
Protestants (expand)
Total: 1
Matters Sortable Matter Listing (showing 25 most recent, to see all click here)
MatterID Type Summary Date PDF(s)
250010 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter Informing of a Potential Impact to the Scheduled Completion of Modules CA20 and CA01
On behalf of: Office of Regulatory Staff
4/10/2014 Letter
249892 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Review of South Carolina Electric and Gas Company's 2013 4th Quarter Report on V.C. Summer Units 2 and 3 Status of Construction
On behalf of: Office of Regulatory Staff
4/7/2014 Review Report
Scanned Matter
249836 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter and Comments
On behalf of: Joseph Wojcicki
4/3/2014 Scanned Matter
249169 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #9 - Discuss with the Commission South Carolina Electric & Gas Company's Request for Confidential Treatment of the Quarterly Report for the Fourth Quarter of 2013 Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3
On behalf of: Clerk's Office
2/26/2014 directive
248985 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report for Period Ending December 31, 2013 Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
2/11/2014 Cover Sheet and Letters
Report
248375 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Review of South Carolina Electric and Gas Company's 2013 3rd Quarter Report on V.C. Summer Units 2 and 3 Status of Construction
On behalf of: Office of Regulatory Staff
1/13/2014 Report
247620 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report for Period Ending September 30, 2013 Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
11/8/2013 Letter
Report
247001 Petition Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Petition Opposing the Plans to Build Nuclear Reactors in South Carolina
On behalf of: Leslie Minerd
10/3/2013 Petition
245942 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #15 - Discuss with the Commission South Carolina Electric & Gas Company's Request for Confidential Treatment of the Quarterly Report Ending June 30, 2013, Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3
On behalf of: Clerk's Office
8/28/2013 Directive
245769 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
8/14/2013 Scanned Matter
245662 Transcript Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Transcript of Presentation by the Office of Regulatory Staff at a Special Commission Meeting on July 10, 2013, Regarding V.C. Summer Units 2 and 3
On behalf of: Court Reporter
8/7/2013 Transcript and Attached PowerPoint Slides
245488 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - V. C. Summer Nuclear Station Units 2 and 3 Construction Milestones
On behalf of: Office of Regulatory Staff
7/26/2013 Letter
Cover Sheet
245044 Letter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Letter
On behalf of: Office of Regulatory Staff
7/3/2013 Letter
Cover Sheet
244225 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #12 - Discuss with the Commission a Request for Confidential Treatment of Quarterly Report Ending March 31, 2013, Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3
On behalf of: Clerk's Office
5/22/2013 Directive
244043 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
5/13/2013 Scanned Matter
243449 General Matter Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Email Regarding Holding Discussions on Encouraging Renewable Energy
On behalf of: Pamela Greenlaw
4/30/2013 Scanned Matter
242838 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #8 - Discuss with the Commission Informational Status Update Workshops Regarding the Following Topics: Net Metering, Smart Metering and Nuclear Power Plants
On behalf of: Clerk's Office
4/10/2013 Directive
242025 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #4 - Discuss with the Commission a Request for Confidential Treatment of Certain Information Contained in Appendix 2 and Appendix 3 of Its Quarterly Report Concerning Construction of the V.C. Summer Nuclear Station Units 2 and 3 Filed on Behalf of South Carolina Electric & Gas Company
On behalf of: Clerk's Office
2/28/2013 Directive
241847 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
2/13/2013 Quarterly Report of SCE&G
Scanned Matter
240633 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #12 -Discuss with the Commission a Request for Confidential Treatment of Certain Information Contained in Appendix 2 and Appendix 3 of Its Quarterly Report Concerning Construction of the V.C. Summer Nuclear Station Units 2 and 3 Filed on Behalf of South Carolina Electric & Gas Company
On behalf of: Clerk's Office
11/28/2012 Directive
240421 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
11/9/2012 Docket Cover Sheet
Letter to PSC and COS
Quarterly Report Q3
Cover Sheet
238478 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #9 - Discuss with the Commission South Carolina Electric & Gas Company's Request for Confidential Treatment of the Quarterly Report for the Period Ending June 30, 2012, Related to the Construction of V. C. Summer Nuclear Station Units 2 and 3
On behalf of: Clerk's Office
8/22/2012 Directive
238301 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Quarterly Report (Public Version) Ending June 30, 2012, with a Request for Confidential Treatment of Certain Information Contained in Appendix 2 and Appendix 3
On behalf of: South Carolina Electric & Gas Company
8/14/2012 Docket Cover Sheet
Letter and COS to J. Boyd Filing Qtrly Rpt Ending June 30, 2012
Quarterly Report Ending June 30, 2012
Cover Sheet
236889 Directive Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Commission Directive - Agenda Item #9 - Discuss with the Commission South Carolina Electric & Gas Company's Request for Confidential Treatment of Appendix 2 and Appendix 3 of the Quarterly Report for the Period Ending March 31, 2012
On behalf of: Clerk's Office
5/23/2012 Directive
236751 Report Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina - Redacted and Confidential Quarterly Report Concerning Construction of V.C. Summer Nuclear Station Units 2 and 3 and a Request for Confidential Treatment
On behalf of: South Carolina Electric & Gas Company
5/15/2012 Docket Cover Sheet
Letter and COS
Quarterly Report-March 31, 2012
Cover Sheet
(showing 25 most recent, to see all click here)
Orders
Order# Summary Date PDF(s)
2014-206 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/26/2014 Order No. 2014-206
2013-623 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/29/2013 Order No. 2013-623
2013-346 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 5/22/2013 Order No. 2013-346
2013-238 Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 4/10/2013 Order No. 2013-238
2013-124 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/28/2013 Order No. 2013-124
2012-898 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/28/2012 Order No. 2012-898
2012-644 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/22/2012 Order No. 2012-644
2012-416 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 5/23/2012 Order Number 2012-416
2012-155 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/22/2012 Order Number 2012-155
2011-924 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 12/7/2011 Order Number 2011-924
2011-649 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/31/2011 Order No. 2011-649
2011-613 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/24/2011 Order Number 2011-613
2011-399 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 5/25/2011 Order Number 2011-399
2011-157 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/23/2011 Order Number 2011-157
2010-796 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 12/1/2010 Order Number 2010-796
2010-605 Order Granting Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 9/1/2010 Order Number 2010-605
2010-198 Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 3/3/2010 Order Number 2010-198
2010-108 Order Denying Request - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/2/2010 Order Number 2010-108
2010-35 Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 1/13/2010 Order Number 2010-35
2009-888 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 12/17/2009 Order No. 2009-888
2009-218 Order Denying Petitions - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 4/21/2009 Order Number 2009-218
2009-172 Order Dismissing Petition Without Prejudice - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 3/25/2009 Order Number 2009-172
2009-104 Order Approving Combined Application - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 2/27/2009 Order Number 2009-104
2009-104(A) Order No. 2009-104-(A) - Amended Order Approving Combined Application - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 3/2/2009 Order Number 2009-104(A)
2008-797 Order Granting Authority to Act on Behalf of Ms. Ruth Thomas in Regard to Presentation of Witness - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/18/2008 Order Number 2008-797
2008-756 Order on Intervenor Response to ORS Motion to File and Present Panel Testimony - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/6/2008 Order Number 2008-756
2008-752 Order Granting Motion for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 11/6/2008 Order Number 2008-752
2008-739 Order Amending Order No. 2008-696 - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/28/2008 Order Number 2008-739
2008-724 Procedural Order on Form of ORS Testimony - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/22/2008 Order Number 2008-724
2008-696 Order Granting Request for Confidential Treatment - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/9/2008 Order Number 2008-696
2008-673 Order Permitting Commencement of Initial Construction Activities - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 10/7/2008 Order Number 2008-673
2008-601 Order Appointing Hearing Officer - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/26/2008 Order Number 2008-601
2008-570 Order on Hearing - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/19/2008 Order Number 2008-570
2008-565 Order Granting Admission Pro Hac Vice - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 8/14/2008 Order Number 2008-565
2008-467 Order Granting Confidentiality and a Protective Order - Combined Application of South Carolina Electric & Gas Company for a Certificate of Environmental Compatibility and Public Convenience and Necessity and for a Base Load Review Order for the Construction and Operation of a Nuclear Facility in Jenkinsville, South Carolina 7/8/2008 Order Number 2008-467
Timeline
Event Date
Application Received  
Issue Final Order  
All Other Parties Due Date 10/17/08
Proof Pub Due For Merits Hearing 7/31/08
Rebuttal Testimony Due Date 10/31/08
Return Date 8/20/08
Surrebuttal Testimony Due Date 11/14/08
Applicant/Complainant/Petitioner Testimony Due 9/16/08
Hearings
Date Status Notes
Monday, October 27, 2008 @ 10:30 AM Re-Scheduled Beginning on Monday, Oct. 27, 2008 at 10:30 a.m. and continuing through Friday, Oct. 31, 2008, if necessary
Wednesday, September 10, 2008 @ 12:30 PM Scheduled Hearing to address request to conduct clearing, excavation, construction work & rail line
Wednesday, August 27, 2008 @ 10:00 AM Scheduled Prehearing Conference
Monday, December 1, 2008 @ 9:30 AM Scheduled To continue as necessary
Tuesday, December 2, 2008 @ 9:30 AM Scheduled To continue as necessary
Wednesday, December 3, 2008 @ 9:30 AM Scheduled To continue as necessary
Thursday, December 4, 2008 @ 9:30 AM Scheduled To continue as necessary
Friday, December 5, 2008 @ 9:30 AM Scheduled To continue as necessary
Tuesday, December 9, 2008 @ 9:30 AM Scheduled Continued as necessary
Wednesday, December 10, 2008 @ 9:30 AM Scheduled continued as necessary - start time is at the call of the Chairman
Thursday, December 11, 2008 @ 2:00 PM Scheduled continued as necessary - start time is at the call of the Chairman
Tuesday, December 16, 2008 @ 2:00 PM Scheduled
Wednesday, December 17, 2008 @ 9:30 AM Scheduled continued as necessary - start time is at the call of the Chairman
Thursday, December 18, 2008 @ 9:30 AM Scheduled continued as necessary - start time is at the call of the Chairman